20 MW
Rated power
300 m
Rotor diameter
70,686 m²
Swept area
283 W/m²
Specific power
Specification
Rotor & rating
- Rated power
- 20 MW
- Rotor diameter
- 300 m
- Swept area
- 70,686 m² (calculated from rotor diameter)
- Specific power
- 283 W/m²
- Blade length
- 147 m
Wind conditions
- Cut-in wind speed
- —
- Rated wind speed
- —
- Cut-out wind speed
- —
- IEC class
- —
Drive train & tower
- Drive train
- Medium speed
- Generator
- —
- Tower
- —
Commercial
- Status
- In production
- Segment
- Offshore
- First installation
- 2026
- Markets
- China
- Certifications
- —
Largest Goldwind offshore platform, marketed as GWH300-20(25)MW: 20-25 MW, 300 m rotor, 50-70 m water depth, designed to ride out super typhoons above 60 m/s. First unit - a 20 MW machine with 147 m blades and a 174 m hub - was installed at CTG Zhangpu Liuao Phase 2 (Fujian) in January 2026 and grid-connected on 5 February 2026, reported as the world's first 20 MW turbine connected offshore, with expected annual output above 80 GWh. A 22 MW nacelle for the same platform rolled off the Shantou production line in December 2024.
Other Goldwind Science & Technology Co., Ltd. models
Sources for this specification
- [1]“offshoreWIND.biz - Goldwind starts producing components for 22 MW offshore wind turbine with 300-metre rotor (2024-12-31),” offshorewind.biz. Accessed: Nov. 18, 2026. [Online]. Available: https://www.offshorewind.biz/2024/12/31/goldwind-starts-producing-components-for-22-mw-offshore-wind-turbine-300-metre-rotor
- [2]“offshoreWIND.biz - China Three Gorges grid-connects world's first 20 MW wind turbine installed offshore (2026-02-06),” offshorewind.biz. Accessed: Nov. 18, 2026. [Online]. Available: https://www.offshorewind.biz/2026/02/06/china-three-gorges-grid-connects-worlds-first-20-mw-wind-turbine-installed-offshore
- [3]“回归本质,聚焦价值——金风科技发布全新一代海陆旗舰产品 (Goldwind launches new-generation onshore/offshore flagship products),” goldwind.com. Accessed: Nov. 18, 2026. [Online]. Available: https://www.goldwind.com/cn/news/focus-1038084705804846080/ OEM document
- [4]“金风科技20MW海上风电机组成功吊装,刷新全球纪录 (20 MW offshore unit installed, world record),” goldwind.com. Accessed: Nov. 18, 2026. [Online]. Available: https://www.goldwind.com/cn/news/focus-1197933244742555648/ OEM document
Compiled 2026-11-19. Specifications change without notice — confirm against the manufacturer's current datasheet before tendering.