Changelog
What was added to the index, and when. A record only appears here once a document from the manufacturer itself supports it — so the log dates the evidence, not the announcement.
12
Manufacturers
44
Turbine models
33
Figures cited to a page
across 6 models
4
Documents cited at page level
First public build
2026-11-19The index opens with 12 manufacturers and 44 machines. Every published figure is tied to a document the manufacturer itself issued, and that document is archived so the claim can be re-checked later.
- 44 machines across 12 manufacturers, from 2 MW (CRRC Shandong CWT2000A-130) to 26 MW (Dongfang H26-313).
- 33 figures on 6 machines carry a page number and the exact line they were read from. A build step re-opens the archived PDF, jumps to that page and rebuilds the number from the quoted line; if the line moves or the file's checksum changes, the build fails.
- References are printed in IEEE form with the date the archived bytes were fetched, so a citation and the file it points at can be reconciled later.
- Where two documents from the same manufacturer disagree, both figures are shown. GWH182-8.0 carries such a note today: 183.5 m rotor in the Q3 2025 brochure, 182 m in the February 2025 EPD.
- Field coverage at this build: rated power 44/44, rotor diameter 43/44, drive train 35/44, IEC class 11/44, cut-in and cut-out wind speed 8/44, hub height 10/44. Swept area is derived where only the diameter is published.
- The dataset is downloadable: /data/turbines.json and /data/manufacturers.json carry the same records the pages are built from.
What is in the index today
Download the dataset →| Manufacturer | Models | Power range | Figures cited to a page |
|---|---|---|---|
| CRRC Shandong | 2 | 2–4 MW | — |
| CRRC Zhuzhou | 3 | 6.25–20 MW | — |
| CSSC Haizhuang | 3 | 12.5–25 MW | — |
| Dongfang Electric | 4 | 10–26 MW | — |
| Envision | 5 | 5–14 MW | 21 |
| Goldwind | 4 | 7.2–20 MW | 12 |
| Hunan Xinglan | 3 | 6.25–8.5 MW | — |
| Mingyang | 5 | 6.25–20 MW | — |
| Sany | 4 | 6.25–15 MW | — |
| Shanghai Electric | 5 | 6.25–18 MW | — |
| Sinovel | 2 | 3–5 MW | — |
| Windey | 4 | 7.7–16 MW | — |
Data compiled 2026-11-19. The machine list is rebuilt from the same JSON that /data/turbines.json serves, so this table and the index cannot drift apart.