20 MW
Rated power
260 m
Rotor diameter
53,093 m²
Swept area
377 W/m²
Specific power
Specification
Rotor & rating
- Rated power
- 20 MW
- Rotor diameter
- 260 m
- Swept area
- 53,093 m² (calculated from rotor diameter)
- Specific power
- 377 W/m²
- Blade length
- —
Wind conditions
- Cut-in wind speed
- —
- Rated wind speed
- —
- Cut-out wind speed
- —
- IEC class
- —
Drive train & tower
- Drive train
- Medium speed
- Generator
- —
- Tower
- —
Commercial
- Status
- Prototype
- Segment
- Offshore
- First installation
- 2025
- Markets
- China
- Certifications
- —
Floating offshore landmark and, at 20 MW, the highest-power floating unit hoisted anywhere; unveiled at WindEnergy Hamburg in 2024 and installed in Dongying, Shandong, in January 2025. The 22 MW generator adapts CRRC rail-traction motor technology and the drivetrain is designed to hold tilt below 5 degrees in a category-17 typhoon; a 66 kV dry-type transformer sits in the nacelle. CRRC quotes about 62 GWh a year per unit, 3,500 full-load hours at design wind speed, and an 18-month development cycle. It is a prototype with no series orders disclosed.
Other CRRC Zhuzhou Institute Co., Ltd. (CRRC Wind Power) models
Sources for this specification
- [1]“启航号 20MW floating offshore wind turbine (CRRC),” crrcgc.cc. Accessed: Nov. 18, 2026. [Online]. Available: https://www.crrcgc.cc/crrcgc/2026-01/15/article_2026011513495871404.html OEM document
- [2]“中车株洲所的深海突围战 (《风能》 via 世纪新能源网, 15 Jul 2025),” m.ne21.com. Accessed: Nov. 18, 2026. [Online]. Available: https://m.ne21.com/news/show-215846.html
Compiled 2026-11-19. Specifications change without notice — confirm against the manufacturer's current datasheet before tendering.